{"id":11647,"date":"2024-06-21T13:38:06","date_gmt":"2024-06-21T11:38:06","guid":{"rendered":"https:\/\/www.dualis-it.de\/en\/?p=11647"},"modified":"2025-02-26T13:54:19","modified_gmt":"2025-02-26T12:54:19","slug":"production-scheduling-software-9-must-haves-for-a-flawless-workflow","status":"publish","type":"post","link":"https:\/\/www.dualis-it.de\/en\/production-scheduling-software-9-must-haves-for-a-flawless-workflow\/","title":{"rendered":"Production Scheduling Software: 9 Must-Haves for a Flawless Workflow"},"content":{"rendered":"\n
From the rise of customised goods to the volatility of sourcing and a talent gap, manufacturers are facing unprecedented challenges. Fortunately, modern Production Scheduling Software empowers businesses to navigate these complexities toward an agile and customer-oriented production. This article delves into the functionalities of such software and the key considerations for a successful implementation, ensuring you stay ahead of the curve in this dynamic market.<\/strong><\/p>\n\n\n\n Production scheduling, a cornerstone of production management, plans and allocates resources such as orders, machines, and labour within the production process. Production Scheduling Software steps in to elevate this crucial function. Its primary objective is to maximise efficiency and productivity by minimising bottlenecks, shortening throughput times, and optimising production targets. This optimisation is achieved by factoring in critical elements during its calculations. These elements include factors like capacity utilisation, material and personnel availability, machine and workstation constraints, set-up times, and even delivery deadlines.<\/p>\n\n\n\n A Production Scheduling Software generates optimized actionable production plans based on defined target criteria.<\/strong><\/em><\/p>\n\n\n\n Production Scheduling Software such as GANTTPLAN and scheduling boards are two different approaches to planning and controlling production processes. While Production Scheduling Software leverages advanced computing using complex algorithms and optimisation techniques to create detailed production schedules, scheduling boards are often physical boards or whiteboards that are used purely to visualise and communicate production plans.<\/p>\n\n\n\n Accordingly, digital production scheduling differs from a simple scheduling board in the following ways:<\/strong><\/p>\n\n\n\n When machines go offline, modern Production Scheduling Software seamlessly integrates backup options from the work plan, as long as all systems and machines and their availabilities have been adequately maintained in the system. It factors in differences such as speed, staffing needs, and variable costs to optimise the new schedule. In addition, the software can identify non-critical orders that can wait for the original machine to be repaired.<\/p>\n\n\n\n Streamline production despite downtime:<\/strong> Production Scheduling Tools offer a powerful toolkit for managing unexpected machine issues:<\/p>\n\n\n\nDifferentiation between a Production Scheduling Software and Scheduling Boards<\/h2>\n\n\n\n
\n
\n
\n
\n
\n
Keeping the line moving: The role of production scheduling in overcoming machine downtimes<\/h2>\n\n\n\n
\n